Plans and projects:

So far, Ayerma has carried out more than 38 projects in the fields of mining and mineral industries, offering design, consulting, and implementation services to various mining companies for exploration, extraction, and mineral processing. These projects include both large and small-scale operations in zinc, copper, and gold mining.

Plans and projects

Current Projects of Ayerma

  • Exploration and reconnaissance operations in the exploratory areas of Kurdistan Province – 2022
  • Exploration and reconnaissance operations in the exploratory areas of South Khorasan Province – 2022
  • Exploration and reconnaissance operations in the exploratory areas of Gilan Province – 2023
  • Restoration and reconstruction of cultural heritage projects, currently in progress at Ebrahim Khan Mansion, Maladeh Mahdi Shahr – 2023
  • Design and construction of a nickel sheet production plant with a capacity of 1,000 tons per year – 2023 (currently ongoing)
  • Construction of a cobalt sheet production plant, the first in Iran and the Middle East, with a capacity of 1,000 tons per year – 2023
Plans and projects
% 1

Nickel sheet production plant: 92% completed

% 1

Cobalt sheet production plant: 100% completed

% 1

Preliminary and detailed exploration in Kurdistan, Gilan, and South Khorasan provinces: 56% completed

% 1

Mining extraction and processing project management: 100%

  • Technical and financial feasibility consulting for increasing the efficiency of low-grade ore lines at the Angouran Lead and; Zinc Concentration Complex – 2007
  • Flotation instructions for lead and zinc processing at Calcimin Company – 2007
  • EPC consulting for the construction of Kimia Zanjan Gostaran plant with annual production of 110,000 tons zinc concentrate and 30,000 tons lead concentrate, including flotation, filtration, crushing, grinding, and blending systems – 2008
  • Consulting for low-grade zinc flotation line at Asia Zarin Madan Company
  • Design and construction of treatment ponds at Asia Zarin Madan Company
  • Exploration consulting for Iljaq Potash Mine, Zanjan (largest potash mine in Iran) – 2008
Plans and projects
  • Contractor for Iljaq Potash Processing Plant under MC and EPC (design, execution, supervision) and feasibility study for potassium chloride production – Alborz Iranian Fertilizer Company
  • Salt dome potential study in Dasht-e-Faramarzan, Hormozgan for a salt processing plant – Mosayleh Mineral Salts Mine
  • Study of Darbast salt dome, Hormozgan for industrial and edible salt production potential – 2010
  • Flotation studies of kyanite ores from potash mines – 2011
  • Flotation studies of and sylvite ores from potash mines – 2011
  • Arsenic recovery from lead concentrate for Asia Zarin Madan Company – 2011
  • Arsenic removal solutions for lead concentrate for Asia Zarin Madan Company – 2011
  • MC contract management for Rangin Felez plant for lead ingot production – 2012
Plans and projects
  • Obtaining exploitation license for the largest phosphate deposit in Iran with 81 million tons confirmed and 127 million tons potential – Choram, Kohgiluyeh and Boyer-Ahmad – 2013
  • Preliminary construction of phosphate concentration plant and downstream phosphate industrial city – 2013
  • Raising tailings dam at Mazraeh mining area, East Azerbaijan – 2013
  • Exploration of phosphate deposits in Siah Phosohate , Rish, Nil, Mandoun Sheikh Habil,, Lar areas – Kohgiluyeh and Boyer-Ahmad Province – 2013
  • Reconnaissance and exploration of Namakhour (Khormoj) Areas, Bushehr Province – 2013
  • Exploration of Sepidar Mountain phosphate area – Khuzestan – 2013
  • Detailed exploration of Bagh-e Alishir Delfard Copper Area – Kerman Province– 2014
  • Reconnaissance exploration in Jiroft expolration areas – Kerman Province– 2014
  • Exploration consulting in Birjand, South Khorasan for Iranian Lead and Zinc Production and Development Company – 2014
  • Plans and projects
    • Preliminary and detailed lead and zinc exploration – South Khorasan – 2015
    • Consulting for Sa’id Kandi Zanjan phosphate contractor, Jahad Nasr Zanjan – 2015
    • Technical and economic evaluation of Lake Urmia for industrial investment – 2016

    • Exploratory drilling in Sa’id Kandi phosphate area – Zanjan – 2016
    • Detailed exploration of Qaleh Ali-Moradkhah Copper Area, Malayer– 2016
    • Pilot production of technical phosphoric acid from low-grade phosphate of Koh-e Lar – 2016
    • Reconnaissance and exploration of Shakhab lead and zinc area, Damghan – 2017
    • Design and implementation of tailings dams for lead and zinc factories in Zanjan – 2017
    • Reconnaissance and exploration of copper exploratory areas in Qalehganj, Kerman – 2017
    • Reconnaissance and exploration in Zanjan exploratory areas – Kimia Zanjan Gostaran Company – 2018
    • Reconnaissance and exploration in Semnan exploratory areas – Asia Zarin Mdan Company – 2018
    • Reconnaissance and exploration in Halilabad Zanjan exploratory region – Kimia Zanjan Gostaran Company– 2018
    Plans and projects