Completed Projects

  • Drilling in 1000 m by the purpose of reserve evaluation in Saeid Kandi Zanjan (Client: Jahade Nasr Corporation of Zanjan).Year: 2015. Project manager: Armin Salsani.
  • Detailed exploration studies of Saeid Kandi low grade phosphate deposits. (Client: Jahade Nasr Corporation of Zanjan).Year: 2015. Project manager: Armin Salsani.
  • Prospecting and exploration of lead & Zinc resources in east of Iran (Khorasan province). (Client: Iranian lead & zinc Co). Year: 2014. Project manager: Ehsan Piri.
  • Prospecting and exploration of lead & Zinc resources in central Iran (Kerman province). (Client: Ayerma Co). Year: 2014. Project manager: Shahb Ziaei.
  • Prospecting and exploration of phosphate resources in south west Iran (Ramhormoz, Khurmoj, Namak anticlines). (Client: AYERMA Co). Year: 2013. Project manager: Armin Salsani.
  • Basic and detailed engineering studies of the biggest phosphate ore body called Lar phosphate deposits in south west of Iran (Ayerma Co). Year: 2012. Project manager: Shahram Shariati.
  • Lab scale, Bench scale and pilot studies for phosphate beneficiation. Year: 2013. Project manager: Shahram Shariati.
  • Detailed exploration studies in Iljagh potash mine (Client: Iran Potas Co). Year: 2010. Project manager: Mahmoud Ahmadzade Heravi.
  • Construction of Kimyaye Zanjen Gostaran lead and zinc processing plant with capacity of 110,000 tons of zinc concentrate and 30,000 tons of lead concentrate in an EPC in 2008 including a floatation line, filtration, crushing and grinding and mixing ponds.(Client: Kimia Zanjan Gostaran Co.). Year: 2010. Project manager: Shahram Shariati.
  • Designation and construction of pool water treatment in Asia Zarin Madan Corporation. (Client: Asia Zarin madan Co). Year: 2008. Project manager: Ali Akbar Karamzadeh.
  • Plant construction of Iranian Alborz Fertilizer by Annual capacity of 16,000 tons, in Iljaq potash, for potash treatment, as EPC contract (Engineering, Procurement and Construction). (Client: Iranian Alborz Fertilizer). Year: 2010. Project manager: Amir Ahadi.
  • Study of the Masilleh salt dome in Faramarzan plain and Hormozgan for the construction of salt processing plant. (Client: Masileh mining co). Year: 2010.